We have now published the results from our stakeholder consultation 'Have Your Say' that closed January 2016.  We were delighted with the number of responses that we received and the feedback that was provided.  The feedback has identified some key areas for us to focus on for 2016/17. Thanks to all those that took part.  We will be providing an update on our progress in November.

Stakeholder consultation results

 

Register / Login




or Register now!  

National Grid Gas Distribution
Talking Networks

Archive

This page shows the outputs from the workshops and consultations that were held to develop our RIIO-GD1 Business Plans.

19th March 2012

Stakeholder consultation launched on 19th March 2012

We submitted our initial Business Plan to Ofgem in November 2011.  Since this time we have continued to engage with stakeholders and Ofgem, and there are a number of areas of our plan that we are currently reviewing for our April resubmission


We welcome your views on any aspect of our plan, together with the specific areas identified in the consultation document. 

.
Please respond by Friday 6th April 2012 by:
Email: talkingnetworks.distribution@uk.ngrid.com
Write to:Tracy Hine, National Grid House, Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA
Telephone:Tracy Hine on 01926 656923

.........................................................................................................................................................................................................................................

7th February 2012

RIIO-GD1 Update

Ofgem decision on Fast Track for Gas Distribution Networks

As part of gas distribution’s price control review (RIIO-GD1), National Grid Gas Distribution submitted our detailed business plan (for the 8 years from 2013/14) to Ofgem on 30th November.

Since then we have met with Ofgem and their Board and have received positive feedback about the quality of our plan. On Friday, Ofgem published a letter announcing that they had completed their initial assessment. They noted that the plans were much more comprehensive and higher quality relative to previous price control submissions, and were informed by a far greater degree of stakeholder engagement. This engagement has helped Ofgem to consider whether our plan, and those of the other networks, should move to the “fast-track” process.

In addition, Ofgem noted that the change to the HSE policy on iron mains replacement compressed the time available for the RIIO-GD1 fast track process and that they would require networks to achieve a very high-hurdle for their plans to be considered for fast-tracking.

Ofgem concluded that it would be difficult for all networks to resolve outstanding matters that were in the consumer interest within the restricted timetable.  Consumers would be better served by resolving such issues on an industry-wide basis and over a longer time-frame than through the accelerated fast track process. Ofgem have therefore concluded that no GDN should be retained in the fast track process.

We welcome this early decision as it now allows networks a greater period of time to resolve key issues that Ofgem will set out in their Initial Assessment (17th February). The Initial Assessment will also identify proposed level of regulatory scrutiny for each network.

Following this publication, and ahead of final re-submission on 27th April, we look forward to working with Ofgem, stakeholders, and other networks to resolve any outstanding issues, and will consider updates to our plan in light of feedback received.  

For further information, please contact Tracy Hine, Stakeholder Engagement Manager at tracy.hine@uk.ngrid.com

...............................................................................................................................................................................................................................................

19th December 2011

National Grid Gas Distribution held two further stakeholder engagement sessions at London and Birmingham on 13th and 14th December.  Both events looked at the impacts at a more local level as well as providing an overview of our business plan submission. 

The event on 13th covered our London network and the agenda and slidepack from the day can be found here.

The event on 14th covered our East of England, North West and West Midlands networks and the agenda and slidepack from the day can be found here.

.............................................................................................................................................................................................................................................
 21st November 2011

 National Grid Gas Distribution carried out consumer research in June 2011.  This research was conducted by Accent with the purpose of determining service levels that are expected and considered acceptable across a number of core business areas.

 The presentation can be found here.

..................................................................................................................................................................................
 31st October 2011

National Grid Distribution held two further stakeholder engagement sessions at London and Birmingham on 21st and 28th September 2011.

The presentation that was given on the day and the summary report of findings can be found by clicking on the links.
The 'Be a planner for a day' Repex Model and scenarios which were used at the workshops can also be accessed by clicking the links.

.........................................................................................................................................................................................................................................
Talking Networks - Stage 3 Stakeholder Engagement Workshops
 

Final opportunity to comment on our detailed business plan proposals
 

Our Gas Distribution business plan was originally scheduled to be submitted to Ofgem at the end of July but because of the Health and Safety Executive (HSE) review of the iron mains replacement programme it is now due at the end of November 2011.
 

In light of the HSE’s decision, we will be holding two further workshops to discuss these changes, focus on the topics where you have previously told us more discussion is required and also cover anything else you think is important.
 

The workshops are scheduled for 21st September 2011 in London and 28th September in Birmingham. Please see accompanying leaflet for further information.
 

If you would like to attend either event please contact us at talkingnetworks.distribution@uk.ngrid.com
 

...............................................................................................................................................................................................................................
 28th June 2011
 

National Grid Distribution held two further stakeholder engagement sessions at London and Birmingham on 16th and 18th May 2011.
The presentation that was given on the day and the summary report of findings can be found by clicking on the links. 

......................................................................................................................................................................................................................................
 14th June 2011
 

Revision to RIIO-GD1 timeline for submission of our Gas Distribution business plans
14th June 2011
 

Today, Ofgem announced a revision to the RIIO-GD1 timeline.
 

Link to Ofgem notification 

Over recent months the Gas Distribution Networks (GDNs) have been working closely with the HSE and Ofgem to review the iron mains replacement programme.  In the light of this work, on 9th June the HSE signalled a significant change in the approach to the programme.
 

For this reason, Ofgem has decided that the GDNs require sufficient time to reflect the changes to the replacement programme approach in the RIIO-GD1 business plans. For National Grid Gas Distribution, we believe that this will allow us time to give proper consideration to the implications of the HSEs decision, seek the views of our stakeholders and revise our well-justified business plans accordingly.
 

As such, the submission of the GDNs RIIO-GD1 business plans will be delayed by 4 months (from end-July to end-November).
 

National Grid remain fully supportive of the HSE and Ofgem and will continue to work with both, as well as a wide range of stakeholders. We look forward to continuing our engagement as we develop these revised plans and believe this is an excellent opportunity for us to deliver a replacement programme that is right for consumers, employees and shareholders.
 

This decision does not impact the timetable for the Transmission price control review (RIIO-T1), which will continue along the existing timeline.
 

For further information, please contact:
 

Tracy Hine, Stakeholder Engagement Manager on  talkingnetworks.distribution@uk.ngrid.com
 ...........................................................................................................................................................................................................................................
 29th March 2011
 

A customer questionnaire aimed at securing customers comments on a number of our business areas has now been published.
 

We would appreciate as many views as possible in order to help inform our well jsutified business plan.
 

Please select questionnaire at the top of the webpage to complete. 

................................................................................................................................................................................................................................................
 21st Feb 2011
 

National Grid met with members of SBGI on 28th January.
 

We have available the materials presented at the seminar including a report which summarises the discussions that took place on the day.
 

We have also provided a questionnaire which picks up on the questions posed at the event.   We remain keen to understand the views of all stakeholders who did not attend the event and for those that did attend we are keen to receive any additional views you may have.
 

Could you please complete and return the questionnaire to us by 11th March to talkingnetworks.distribution@uk.ngrid.com
 

............................................................................................................................................................................
 9th Feb 2011
 

National Grid hosted a Gas Industry event  on 11th January.   The event was designed to
explore what outputs National Grid's Gas businesses should be delivering during our next
price control (2013 - 2021).
 

We have made available all of the workshop material and a questionnaire.
 

The questionnaire picks up on the questions posed at the event.   We remain keen to understand the views of all stakeholders who did not attend the event and for those that did attend we are keen to receive any additional views you may have.
 

Could you please complete and return the questionnaire to us by 4th March to talkingnetworks.distribution@uk.ngrid.com
 

...........................................................................................................................................................................................................................................
 16th Dec 2010
 

National Grid hosted a Safety & Reliability event  on 7th December.  The event explored what safety & reliability outputs National Grid's Gas Distribution business should be delivering during our next price control (2013 - 2021).
 

We have now made available all of the workshop material a summary report from the event and a questionnaire.
 

The questionnaire picks up on the questions posed at the event.   We are keen to understand the views of stakeholders who did not attend the event and for those that did attend we are keen to receive any additional views you may have.
 

Therefore we would appreciate it if you could complete and return the questionnaire to us by 14th January 2011.
 

.....................................................................................................................................................................................................................................
 10th Dec 2010
 

National Grid Distribution held a Safety & Reliability workshop on 7th December in London.
 

The summary report from the Talking Networks event can be found here.
 

.....................................................................................................................................................................................................................................
 3rd Dec 2010
 

National Grid hosted a Social & Customer event with Fuel Poverty Group members on 24th November.  The event explored what Social & Customer outputs National Grid's Gas Distribution business should be delivering during our next price control (2013 - 2021).
 

We have now made available all of the workshop material a summary report from the event and a questionnaire.
 

The questionnaire picks up on the 11 questions posed at the event.   We are keen to understand the views of stakeholders who did not attend the event and for those that did attend we are keen to receive any additional views you may have.
 

Therefore we would appreciate it if you could complete and return the questionnaire to us by 7th January 2011.
 

....................................................................................................................................................................................................................................
 29th Nov 2010
 

National Grid hosted a joint Gas Distribution and Electricity and Gas Transmission environment event on 8th November.
 

A wide range of stakeholders were invited to the event in order to explore what environmental outputs National Grid's Gas Distribution and Electricity and Gas Transmission businesses should be delivering during our next price control (2013 - 2021).
 

A pack containing all pre-meeting materials, presentations given on the day and a detailed report of the workshop are now available.
 

We are keen to understand the views of stakeholders who did not attend the event and for those that did attend we are keen to receive any additional views you may have. Therefore we would appreciate it if you could complete the Environment questionnaire and email it to
 

talkingnetworks.distribution@uk.ngrid.com  
 

Please complete and return the questionnaire by 24th December 2010
 ........................................................................................................................................................................................................................
 25th Nov 2010
 

In April 2010, National Grid along with the other DN's through the Energy Networks association, commisioned Redpoint to undertake a long-range scenario-based modelling study of the future utilisation of gas out to 2050, and the consequential impacts of this for gas networks.
 

The Gas Futures Scenario Project - Final Report has now been published and shows that there are credible and robust scenarios in which gas could play a major ongoing role in the GB energy mix while meeting both the 2050 carbon targets and the 2020 renewable energy targets.
 

......................................................................................................................................................................................................................
 23rd Nov 2010
 

Utility Week article on National Grids' stakeholder engagement activities to date.
 

......................................................................................................................................................................................................................
 11th Nov 2010
 

National Grid held a joint Distribution and Transmission Environment workshop on 8th November at Chelsea football ground in London.
 

The summary report from the Talking Networks event can be found here.
 